104

Design and Construction of a Bridge & Approach road at Kandapamchal across Iruvazhinjipuzha on Nellipoyil – Narangathode – Kandapamchal Muthappenpuzha road in Kozhikode District

The breathtaking beauty of Kandapamchal Bridge, designed and constructed by ULCCS, changed the face of the location. The project was awarded by the Public Works department, Kozhikode North Circle. Under the monitoring of director Padmanabhan M. the project was completed within a time period of just 15 months. The bridge could bridge people’s dreams with reality, enabling quick and safe transportation.